Polycab UH-13 Smart Meter - RCC Building Project

The Polycab UH-13 Smart Meter facility is a cutting-edge infrastructure featuring a reinforced concrete building with a total built-up area of 3,75,000 sq. ft., comprising Ground Floor (GF), First Floor (FF), and Second Floor (SF). Each slab is constructed with a height of 5.5 meters. The structure is topped with a Prefabricated shed, Constructed to support the operational needs of smart meter manufacturing and logistics.

Construction Timeline

The entire construction activity was meticulously planned and executed within a 9-month schedule, reflecting efficient project management and adherence to quality standards.

Key Machinery & Technologies Used

To achieve precision, speed, and safety, the following advanced machinery and formwork systems were deployed:

  • KYB-Conmat Batching Plant (30 m³/hr) - Ensuring consistent and high-quality concrete production.

  • Schwing Stetter Boom Pump - Facilitating efficient concrete placement across all levels.

  • HANDSET Alpha Panel Formwork - Providing flexibility and accuracy in wall and column formwork.

  • PERI UP MI Stair Tower - Enabling safe and reliable vertical access during construction.

  • PERI VT20 - High-performance timber beams for slab formwork.

  • SBPL Universal Slab Formwork - Supporting large-scale slab casting with speed and precision.

Total Reinforcement Consumption : 2100 metric tons / Total Concrete Consumption :21500 cubic meters

Polycab Unit-13 (smart meter) in Halol, Vadodara
Polycab Unit-13 (smart meter) in Halol, Vadodara
Polycab Unit-13 (smart meter) in Halol, Vadodara
Polycab Unit-13 (smart meter) in Halol, Vadodara
Polycab Unit-13 (smart meter) in Halol, Vadodara
Polycab Unit-13 (smart meter) in Halol, Vadodara
Polycab Unit-13 (smart meter) in Halol, Vadodara
Polycab Unit-13 (smart meter) in Halol, Vadodara